Solution to a Production Scheduling Problem with Fixed Costs
Year: 1962
Type: article
DOI: 10.1057/jors.1962.9
Authors: D. E. Wagner, C. M. Shetty
Institutions: Northwestern University, Northwestern University
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: closed
OpenAlex ID: W1980624144
