Work

Resin-Based Preparation of HTGR Fuels: Uranium Loading Development Studies

Year: 1975
Type: article
Abstract: Uranium leading flowsheet conditions for recycle 233U were investigated and demonstrated in engineering equipment. Calculations made to estimate the capacities of equipment which is geometrically safe with respect to control of nuclear criticality indicate 100 kg/day or more of uranium for a single nitrate extraction line with four batch loading contactors. The four batch contactors might be replaced by a single continuous resin loading contactor of a modified Higgins contactor design. The resin loading process using solvent extraction of nitrate appears practical for use in a commercial-scale HTGR fuel recycle plant.
Author: Haas, P.A.
Language: English
Field: Energy
Open Access status: green
OpenAlex ID: W2001190154
FWCI: 1.454
Cites:
Cited by: 1
Related to: 10