Estimating pressurized water reactor decommissioning costs: A user`s manual for the PWR Cost Estimating Computer Program (CECP) software. Draft report for comment
Year: 1993
Type: report
Abstract: With the issuance of the Decommissioning Rule (July 27, 1988), nuclear power plant licensees are required to submit to the US Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. This user`s manual and the accompanying Cost Estimating Computer Program (CECP) software provide a cost-calculating methodology to the NRC staff that will assist them in assessing the adequacy of the licensee submittals. The CECP, designed to be used on a personnel computer, provides estimates for the cost of decommissioning PWR plant stations to the point of license termination. Such cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial costs; and manpower costs. In addition to costs, the CECP also calculates burial volumes, person-hours, crew-hours, and exposure person-hours associated with decommissioning.
DOI: 10.2172/10151037
Institution: Pacific Northwest National Laboratory
Language: English
Subfield: Safety, Risk, Reliability and Quality
Field: Engineering
Domain: Physical Sciences
Open Access status: green
Funder: Battelle
OpenAlex ID: W2008752543