Year: 1997
Type: article
Abstract: We report a social cost‐benefit analysis of the privatisation and restructuring of the Central Electricity Generating Board which generated and transmitted all public electricity in England and Wales until 1990. The main benefits came from generator efficiency gains, switching from nuclear power, and lower emissions. The main costs came from higher prices for imported French electricity, the cost of restructuring and premature investment in the gas‐fired generating plant. Our central estimate is a permanent cost reduction of 5% per year, equivalent to an extra 40% return on assets. Consumers and government lose, and producers gain more than the cost reduction.
Source: Journal of Industrial Economics
Authors: David M. Newbery, Michael G. Pollitt
Institution: University of Cambridge
Language: English
Subfield: Electrical and Electronic Engineering
Field: Engineering
Domain: Physical Sciences
Keywords: Central Electricity Generating Board, privatization, electricity market restructuring, social cost-benefit analysis, electricity market reform, nuclear phase-out, gas-fired power generation, electricity imports, generator efficiency, emission reduction, return on assets, electricity prices
Open Access status: bronze
OpenAlex ID: W2013253939
