Work

A tree-based scheduling algorithm for control-dominated circuits

Year: 1993
Type: conference-paper
Abstract: Scheduling algorithms for control dominated applialgorithm can be restricted to 0(pbn2 ), where p is the number of paths, b is the number of blocks and n is the number of operations.We tested the algorithm on a set of benchmarks and achieved reductions on the number of states as compared with previous algorithms.
Language: English
Open Access status: bronze
OpenAlex ID: W2020234097
FWCI: 15.41
Cites: 3
Cited by: 41
Related to: 8