Bi-criteria and tri-criteria analysis to minimize maximum lateness makespan and resource consumption for scheduling a single machine
Work
Year: 2012
Type: article
Source: Journal of Scheduling
Author Liron Yedidsion
Institution Technion – Israel Institute of Technology
Cites: 14
Cited by: 7
Related to: 10
FWCI: 1.31
Citation percentile (by year/subfield): 89.39
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Sustainable Development Goal Decent work and economic growth
Open Access status: closed