Year: 1971
Type: conference-paper
Abstract: This paper is concerned with the allocation of a single type of resource in project networks (such as the PERT representation) composed of activities whose processing times are random variables. There is a continuum of alternative processing methods for each activity and corresponding costs (resource utilizations) associated with each method. The effects of these different processing methods for any given activity are represented by modifications in the probability functions of the time required to complete that activity. Over the duration of a project, the decision maker (i.e., project manager) must decide which method (i.e., probability function) should be used for processing each activity. This sequential decision making must be performed so as to minimize the expected completion time of the entire project in light of restrictions on overall resource availability. A simulation study was performed to analyze the comparative effectiveness of several decision rules for “solving” this problem. This paper presents the results of the initial stages of that study.
Source: Winter Simulation Conference
Author: John M. Burt
Institution: University of California, Los Angeles
Language: English
Field: Decision Sciences
Domain: Social Sciences
Open Access status: bronze
OpenAlex ID: W2031676533