Work

Numerical Analysis of Air Measuring Station Location Optimization in Underground Mine Airway

Year: 2014
Type: article
Abstract: The optimized air measuring station location of mine airway based on air fully developed was proposed and numerical tests were conducted with six models. The independence of air fully development and inlet velocity was analyzed which validated the models and the numerical methods. The results show that optimized air measuring station location in head entry is 132m-198m after the airway turning while 5.0m-10.1m before the airway turning in tail entry.
Language: English
Open Access status: hybrid
OpenAlex ID: W2032504813
FWCI:
Cites:
Cited by:
Related to: 10