Work

The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops

Year: 2001
Type: article
Institution: Université Laval
Language: English
Open Access status: closed
OpenAlex ID: W2054152253
FWCI: 3.665
Cites: 14
Cited by: 43
Related to: 10