Year: 1984
Type: article
Abstract: The Mark-II Data Acquisition and Trigger system requirements and general solution are described. The solution takes advantage of the synchronous crossing times and low event rates of an electron positron collider to permit a very highly multiplexed analog scheme to be effective. The system depends on a two level trigger to operate with acceptable dead time. The trigger, multiplexing, data reduction, calibration, and CAMAC systems are described.
Author: M. Breidenbach
Language: English
Subfield: Nuclear and High Energy Physics
Field: Physics and Astronomy
Domain: Physical Sciences
Open Access status: green
Awards: G1325202077, G2371548206
OpenAlex ID: W20589258
