Work

Evaluating Extension Program

Year: 1951
Type: article
Study design: Observational Study
Abstract: Extension teaching is always confronted with the problem of evaluation since check lots cannot be run. After a job is completed, how can one tell how effective it has been? It has been necessary to depend upon a survey, and surveys are costly in time and personnel. In connection with a consumer education project we are conducting in Milwaukee, we decided to check on means of evaluating the work. Would the same degree of accuracy exist if the office personnel called a sample group by phone as one would obtain by personal interview? Use of the telephone would be simple and inexpensive. Two stores, one independent, the other a chain, were selected in two comparable neighborhoods. A questionnaire was used from which we are selecting two items: price paid for eggs and number of eggs purchased per person per week. Persons were interviewed in each store; in their homes in . . .
Authors: J.B. Hayes, E.A. Jorgensen
Language: English
Open Access status: hybrid
Estimated APC paid: $2,600
OpenAlex ID: W2065855149
FWCI:
Cites: 5
Cited by:
Related to: 10