Scheduling to a common due date on parallel uniform processors
Year: 1987
Type: article
Abstract: We consider scheduling a set of jobs on parallel processors, when all jobs have a common due date and earliness and lateness are penalized at different cost rates. For identical processors, the secondary criteria of minimizing makespan and machine occupancy are addressed. The extension to different, uniform processors is also solved.
Source: Naval Research Logistics (NRL)
Author: Hamilton Emmons
Institution: Case Western Reserve University
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W2067480095
