Standardizing instream flow requirements at hydropower projects in the Cascade Mountains, Washington
Year: 1993
Type: article
Abstract: Instream flow requirements are common mitigation measures instituted in the bypassed reaches of hydroelectric diversion projects. Currently, there are two extremes among the ways to determine instream flow requirements: generic standard-setting methods and detailed, habitat-based, impact assessment methods such as the Instream Flow Incremental Methodology (IFIM). Data from streams in Washington state show a consistent pattern in the instream flow requirements resulting from the IFIM. This pattern can be used to refine the simpler standard-setting approaches and thereby provide better estimates of flow needs during early stages of project design.
Authors: Ian M. Smith, Michael J. Salé
Language: English
Subfield: Nature and Landscape Conservation
Field: Environmental Science
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W206977559
