Total Completion Time in a Two-machine Flowshop with Deteriorating Tasks
Work
Year: 2007
Type: article
Authors Gerd Finke, Ammar Oulamara
Cites: 16
Cited by: 1
Related to: 10
FWCI: 0.794
Citation percentile (by year/subfield): 63.5
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: closed