Year: 1995
Type: article
Abstract: This paper compares the structure of three models for estimating future growth in a time series. It is shown that a regression model gives minimum weight to the last observed growth and maximum weight to the observed growth in the middle of the sample period. A first‐order integrated ARIMA model, or 1(1) model, gives uniform weights to all observed growths. Finally, a second‐order integrated ARIMA model gives maximum weights to the last observed growth and minimum weights to the observed growths at the beginning of the sample period. The forecasting performance of these models is compared using annual output growth rates for seven countries.
Source: Journal of Forecasting
Author: Daniel Peña
Institution: Universidad Carlos III de Madrid
Language: English
Field: Decision Sciences
Domain: Social Sciences
Open Access status: green
OpenAlex ID: W2105921324
