A genetic algorithm-based optimizing approach for project time-cost trade-off with uncertain measure
Year: 2014
Type: article
Abstract: Both the trade-off between the project cost and the project completion time and the indeterminacy of the environment are important issues for real-life project managers. In this paper, an uncertain time-cost trade-off problem, where activity cost functions are assumed to be linear and the objective function to be minimized is the project direct cost, is described based on uncertainty theory. Two uncertain time-cost trade-off models are built to satisfy different management requirements. To solve the proposed models, two equivalent crisp mathematical programming models are given, and genetic algorithm is introduced to search for quasi-optimal schedules. For future research, resource constraints or more types of indeterminacy can be included.
Author: Hua Ke
Institution: Tongji University
Language: English
Field: Decision Sciences
Domain: Social Sciences
Open Access status: hybrid
Awards: G1101679651, 随机与模糊混合环境下的工程进度优化理论及应用研究
OpenAlex ID: W2106407153