Year: 2014
Type: conference-paper
Abstract: A new mid-infrared FEL has been commissioned at the Fritz-Haber-Institut (FHI) in Berlin.It will be used for spectroscopic investigations of molecules, clusters, nanoparticles and surfaces.The oscillator FEL is operated with 15 -50 MeV electrons from a normal-conducting Sband linac equipped with a gridded thermionic gun and a chicane for controlled bunch compression.Construction of the facility building with the accelerator vault began in April 2010.First lasing was observed on Februar 15 th , 2012.[1] The EPICS software framework was choosen to build the control system for this facility.The industrial utility control system is integrated using BACnet/IP.Graphical operator and user interfaces are based on the Control System Studio package.The EPICS channel archiver, an electronic logbook, a web based monitoring tool, and a gateway complete the installation.This paper presents design and implementation aspects of the control system, its capabilities, and lessons learned during local and remote commissioning.
Source: MPG.PuRe (Max Planck Society)
Authors: Heinz Junkes, Wieland Schöllkopf, Michael Wesemann, Ralph Lange
Language: English
Subfield: Electrical and Electronic Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W2107439652
