A New Methodology for Flood Frequency Analysis With Objective Detection and Modification of Outliers/inli Ers
Year: 1981
Type: report
Abstract: SAMPLE SIZE (n), thousandsvarying from 20 to 1000. The procedure applied to each of the 4 algorithms can be considered in 4 steps.1) Generate a sequence of 50,000 to 75,000 deviates.2) Dissect the sequence into sizes of 15, 25, 40, 50, 75, and 100 resulting in 20, 50, 100, 300, 500, and 1000 samples of all sizes with some exceptions.3) Compute 3 statistics, mean variance and skewness g for each sample.4) Compute the mean and standard deviation or variance of each of the 3 statistics for each of the 6 number of samples of size 15, 25, 40, 50, 75, and 100. The values of AV, STD, and Var of the three statistics for different sample sizes and number of samples were calculated from the 4 algorithms. The expected values and standard deviations or variances of the 3 statistics were also computed from equations 7, 8, and 11 to 14. Evaluation of StatisticsThe evaluation of AV and STD or VAR of mean, variance, and skew for 20, 50, 100, 300, 500, and 1000 samples of sizes 15, 25, 40, 50, 75, and 100 is explained by the example of sample size 15 in Table 1. The best rating is 4 assigned to AV, STD, OR VAR from samples closest to the E, or Var from equation 7, 8 and 11 to 14 for the value of n under con sideration. The ratings for 6 values of N (where N is the number of samples of size n) are added to give the total. It is evident from Table 1 that BAMM consistently underestimates statistics AV(X), AV , and AV(g). The combined overall ratings (sum of the 6 totals) for the BAMM, PLRM, INFM, and CLTM are 63, 109, 95, and 93, respectively. The BAMM algorithm does not
Authors: Krishan P. Singh, Masahiro Nakashima
Language: English
Subfield: Water Science and Technology
Field: Environmental Science
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W2182964680
