Work

Designing a Simulator in Building Trades and Using It in Vocational Education

Year: 2010
Type: conference-paper
Abstract: This paper deals with the design, the production and the uses of a simulator for the activity of marking out on building sites from reading a marked plan. The main design principle of this simulator lies in that it is not meant for reproducing accurately the real context of the activity but it should offer the possibility of posing problems of the work situation through a prior conceptual analysis of the professional activity. What is a reading-marking out activity in a building work? Most of building tasks are based on reading plans for marking out on the building site. We call this kind of tasks, reading-marking out tasks. In a building site, setting out elements takes into account what will be set out later. For example, when a floor is to be laid down, the marking out of the floor must leave holes for water pipes and electric cables. Setting out a wall must plan location for windows and doors by marking out their contour. Such marking out is called “boxing out”. Generally speaking, a boxing out is a formwork placed in the middle of a structure before casting concrete, used to set aside an area in which additional equipment can be added at a later date. This task of reading information from a plan to mark out contours and boxing out on the building site is usual for workers in building trades. Two types of controls can be distinguished in the marking out of boxing out:
Source: HAL
Language: English
Subfield: Education
Open Access status: green
OpenAlex ID: W2187927730
FWCI:
Cites: 2
Cited by:
Related to: 10