Work

Reliability Improvement of Bart Train Control

Year: 1978
Type: conference-paper
Abstract: Results of a two-year effort of a task group to improve the reliability of the Bay Area Rapid Transit district's vehicle-borne Automatic Train Control equipment are reported. The effort included modifications to the train control equipment designed both by the manufacturer and by the task goup. It also included the development and implementation of improved maintenance test procedures and equipment. A significant constraint on this effort was the need to maintain, and where necessary, improve the fail-safe nature of the train control system. Particular attention was paid to reducing the fraction of maintenance diagnoses which resulted in a No Trouble Found report; at the start of the task-team effort, these represented half of the revenue service failures of this system. A substantial improvement in the maintenance capability and decrease in service failures has resulted from this effort.
Author: David B. Turner
Language: English
Open Access status: green
OpenAlex ID: W220503758
FWCI:
Cites:
Cited by:
Related to: 10