Work

Factors Contributing to Non-Productive Time in Geothermal Drilling in Kenya: A Case of Menengai Geothermal Project

Year: 2015
Type: article
Abstract: This research work was geared towards determining the factors that contribute to Non Productive Time (NPT) in geothermal drilling. Further, the research sought to find out the contribution of equipment breakdown to Non Productive Time, How geological challenges aid Non Productive Time, ways in which operations planning contribute to Non Productive Time, and how decision making contribute to Non Productive Time. The parameters of interest observed included; completion depth, drilling duration, well location, well design, casing design, drill rig capacity, and number of staff in the rig. A sampling frame of 32 wells was developed. The results of the study revealed enormous amount of Non Productive time associated with geothermal drilling operations in Menengai Geothermal Project. It showed that the average total Non-Productive Time is 62%, while 38% of the total drilling duration is productive time. Operations planning was the biggest contributor of Non Productive time at 41%, equipment breakdowns contributed 12%, geological challenges 8%, and decision 1%. The study provided recommendations that should be undertaken in order to cut down Non Productive Time.
Language: English
Subfield: Fuel Technology
Field: Energy
Open Access status: diamond
OpenAlex ID: W2237340843
FWCI:
Cites: 11
Cited by: 2
Related to: 10