Wall collector design analysis: project status report No. 2. Hing/daylighting prototype development, Phase I
Year: 1981
Type: report
Abstract: The design process and energy analyses for the wall (air) collector component for the passive/hybrid system building alternatives for pre-engineered metal buildings are described. A hybrid collector was coupled to the rockbed storage and ceiling plenum of the office and maintenance spaces. A thermosyphon collector was coupled directly to the interior space of the warehouse. The schematic design, design development, and performance analysis are included. (MHR)