Work

Development of New Model for Computation of External Costs of Hydropower Dams

Year: 2014
Type: preprint
Abstract: Construction of hydropower dams is inevitable in areas with low precipitation. These types of constructions can impose external costs to local people. In order to estimate the external costs, it is necessary to identify and calculate not only the impacts of pollutants and destruction of different environmental units but the advantages of dam construction for the net benefit, as well. In order to compute the true external costs of hydropower dams, the earlier software known as SIMPACTs was revised. The new software is called HECAM that stands for Hydropower’s Environmental Costs Analysis Model. In the present investigation Alborz dam that is located in northern part of Iran was selected as the case study. The external cost resulted from the calculation as per in the SIMPACTs Model is US $/MWh164 US $/KWh or 0.16 or 49 million dollars in a year. had It ought to be pointed out that original model had some bugs, which were removed. Eliminating the bugs from SIMPACTs, furnished US $ 1/KWh instead of US $ 0.16/KWh. It should be noted that this figure does not include advantages and disadvantages of dam construction of dam. Besides, HECAM model encompasses the costs of electricity generation, irrigation and drainage, aquatics and potable water. Moreover, incomes due to the sale of electricity, the exclusion of pollutants, the development of cultivated area, the sales of aquaculture products and potable water, and flood prevention are also included in this new model.
Language: English
Open Access status: green
OpenAlex ID: W2272066685
Cites: 12
Cited by: 4
Related to: 10