Year: 2014
Type: article
Abstract: Introduction: Recent resource assessments have shown that more than 90 GW of small run-of-river and non-powered dam hydropower potential remains undeveloped within the conterminous United States [1,2]. Cost-effectiveness remains a large barrier to developing small and low-head hydropower, and the long lead time and risk associated with permitting and licensing further deter deployment. However, innovations in small hydro technologies have emerged in recent years, and most of them are targeted to addressing high costs and environmental issues. Examples include modular units such as CleanPower's Turbinator [3], the Natel Schneider Linear HydroEngine [4], the MJ2 Very Low Head Turbine [5], and various implementations of the Archimedes Screw Turbine [6,7]. It is important to properly assess and select the best from multiple traditional and novel technology choices to reduce investment risk for the project owner. However, hydro technologies can ultimately be assessed only under site-specific conditions (i.e., site feasibility assessment), and the assessment approach is dependent on the availability of data pertaining to the site. As a project progresses, increasingly detailed data become available, enabling a more detailed modeling approach. This article introduces different levels of modeling approaches, used at different phases of project development, for evaluating and selecting small hydro technology at potential development sites. In light of the limitations of using existing modeling frameworks, the argument is made for developing a new modeling framework that incorporates the small hydro engineering process into the project lifecycle cost-benefit analysis.
Language: English
Field: Energy
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W2339744181
