Year: 2013
Type: article
Abstract: Project Goals Execute stochastic unit commitment (UC) at scale, on real-world data sets Stochastic UC state-of-the-art is very limited (tens to low hundreds of units) Our solution must ultimately be useable by an ISO Produce solutions in tractable run-times, with error bounds Parallel scenario-based decomposition For both upper and lower bounding (Progressive Hedging and Dual Decomp.) Quantification of uncertainty Rigorous confidence intervals on solution cost Employ high-accuracy stochastic process models Leveraged to achieve computational tractability while maintaining solution quality and robustness Demonstrate potential cost savings on an ISO-scale system at high renewables penetration levels
Language: English
Subfield: Electrical and Electronic Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W2342978053
