Abstract: The NSLS-II accelerators finished commissioning in the fall of 2014, with beamline commissioning underway. Part of the design for the NSLS-II is to operate in top off mode. The Top Off Safety System (TOSS) is presently being installed. In this report we discuss the Top Off Safety System design and implementation, along with the necessary tracking results and radiological calculations.