Extended priority list method for unit commitment problem
Year: 2010
Type: article
Abstract: This paper presents a new EPL(Extended Priority List) approach for determining the unit commitment to improve the traditional PL (Priority List) method which can't provide sufficient information for determining the optimal commitment order by using single economic index AFLC(Average Full-Load Cost).A new index (μ-Load Cost) which can reflect unit's economy of different output is defined to broaden economic indexes.By using μ-Load Cost,a neighborhood of unit commitment is formed.Then Unit Utilization Ratio (UUR) is defined to optimize unit's commitment order by conjunction with μ-Load Cost.Furthermore,this paper uses some parameters to control the scale of neighborhood and adopts some heuristics strategies to fulfill operational constraints,which improve the capacity obviously.At last,the presented EPL method is verified by three test systems 26 units,38 units and 45 units.
Author: Fei Lan
Institution: Guangxi University
Language: English
Subfield: Electrical and Electronic Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: diamond
OpenAlex ID: W2351747847
