Risk analysis of building connection tunnel in Wuhan Yangtze River Tunnel
Year: 2008
Type: article
Abstract: The probability and results of various kinds of risk including geologic reliability,underwater with high pressure,asymmetrical sedimentation and fire etc have been analyzed by applying the combination quantitative and qualitative method in this paper,the overall risks of construction and operation of connection tunnel between two main Wuhan Yangtze River Tunnels have been studied according to the principle of AHP.The result shows that the risk with connection tunnel is one time higher than without.Therefore,we suggest that corridor on the bottom of main tunnel should be considered as evacuation passage instead of connection tunnel.
Source: Fire Science and Technology
Author: Huiling Li
Institution: Wuhan University
Language: English
Topic: Risk and Safety Analysis
Subfield: Safety, Risk, Reliability and Quality
Field: Engineering
Domain: Physical Sciences
Open Access status: diamond
OpenAlex ID: W2371569840
