Collaborative manufacturing resources optimization deployment process model and its realization
Year: 2008
Type: article
Abstract: To deal with networked collaborative manufacturing resources optimization deployment problem,a new conception,Agile Manufacturing Process(AMP) was defined. For the purpose of AMP′s creation,the basic conception model and process model of manufacturing resources optimization deployment were constructed by taking processing flow as core. And the networked manufacturing resources optimization deployment process model was summarized as three basic sub-processes: Logical Manufacturing Unit(LMU)-Physical Manufacturing Unit(PMU) mapping,filtering PMU and AMP optimization and creation. Realization methods for these sub-processes were also provided. Finally,the establishments of networked manufacturing resources optimization deployment platforms were discussed,and the application process as well as operation result were analyzed by taking the turbine blade of an aero engine as a typical case. Feasibility and applicability of the process model were verified.
Author: Junxue Ren
Institution: Northwestern Polytechnical University
Language: Chinese
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: diamond
OpenAlex ID: W2394437629
