Primal search tree algorithms for the general job shop problem
Year: 1981
Type: dissertation
Abstract: The scheduling of job-shops has been the subject of considerable study, partly because of the many possible applications, but also because of the somewhat tantalising nature of the problems involved. Much of the analytic effort has been devoted to the construction of the shortest possible schedule. In a notation used by Conway, Maxwell and Miller (1967) and others, this problem is referred to as n/m/G/F(,max) with the following interpretation.
There are n jobs to be processed on m different machines. Each job consists of an ordered list of operations with the machine required and the time involved already determined for each operation. Each operation, once started, must run to completion. Each job may require the machines in a different order. The objective is to minimize the total schedule time.
Of the many approaches to solving this problem, algorithms using branch-and-bound methods have proved to be the most successful. One of the very first applications of this method associated a complete schedule with every node in the search tree. The results of this approach were very poor and were easily surpassed by applications which scheduled only one extra operation at each node in the search tree. All investigations involving branch-and-bound algorithms since have used this latter application.
This thesis proposes a different direction of investigation, one that is related to the schedule at every node approach. A partial, possibly complete, schedule is associated with every node in the search tree. In each schedule, a critical operation is identified and from it, an associated critical set of operations. This set generates a number of sub-problems. The optimum schedule will be the existing schedule or the optimum schedule for one of the sub-problems. A detailed study is then made on a number of algorithms using this approach as a basis.
The results of the algorithms proved to be very promising and were better than the results of any previous algorithm.
The conclusion is reached that the proposed approach to solving the general job-shop problem should be included in future investigations, not at the expense of the approach of scheduling only one operation at each node in the search tree but along with it. Further, some suggestions for future work are given.
Source: UNSWorks (UNSW Sydney)
Author: Barker, J. R.
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W2468587060