Proven practices in construction management for industrial plant projects
Year: 2015
Type: book
Abstract: ProjectsProven practices in construction management for industrial plant projects / 13 Acceptable values of supervision and management ratio are usually lower than 12%.Higher project dimension suggests even lower value of this percentage (till 8%). Planning periodic updatingProvided that, the mission of the project team is to keep the Construction Plan untouched, any eventual change has to be considered an extraordinary event.Main reasons for changes are usually: Soil and geotechnical problems; » Engineering changes and mistakes in the Project;» Critical materials and equipment delivery delays; » Heavy changes in BoQs (piping, support, etc.); » Trade Unions » Construction delays due to some Construction Sub-contractors' poor performance.» Every time a change is made according to these reasons, it must be analysed and approved by the Client and the main Stakeholders from the Contract point of view.Under this assumption, any ordinary monthly planning update should be done based on the original construction plan.Until this plan is in place, input data changes, progress and delays are registered but not included in it.Operating in this way gives a more perceivable indication of the construction status.It even helps stimulating reactions in the Management team.If the Management Team does not have an adequate level of maturity, there is the risk of continuous modifications in the Construction plan that can be seen as possible delay justifications.When it becomes clear, comparing Progress with the existing Plan, a new way is required to stay on target and a recovery Plan shall be implemented.If that is the case, all Engineering and Procurement new data have to be included in this Plan (same for the updated K1 value).To further help this Construction Planning phase, a list of guidelines is presented below: Civil works can start when enough drawings are available on site, usually from 4 to 6 » Construction planning Proven practices in construction management for industrial plant projects / 51 Construction project control Proven practices in construction management for industrial plant projects / 73 [Figure 9.4 -Construction Feasibility concept] Construction project control Proven practices in construction management for industrial plant projects / 77
Source: IRIS Politecnico di Milano
Language: English
Field: Decision Sciences
Domain: Social Sciences
Open Access status: green
OpenAlex ID: W2494598532
