Abstract: Student projects have become an important part of any Engineering Education, to make the students experience what it is like to work as an Engineer. At Group T International University College Leuven in Belgium, we support this philosophy wholeheartedly by organising increasingly complex student projects throughout the three bachelor years. Since 2006, the final project for bachelors in electromechanics (EE5), is an open ended project for which an industrial partner provides an actual design question. In 2012-2013, the large number of 176 students, which have to be evaluated individually, requires a new approach. This large group is split in three smaller groups of about 60 students, each working on one industrial project and coached by three professors. The composition of the teams is determined by the coaches, but the students can choose one partner to cooperate with throughout the project. The project itself is divided in three phases: the orientation and analysis phase, the conceptual phase, and the detailed design phase. During the first phase, a representative of the company meets with the students to explain the problem and define the requirements in an open discussion. At the end of the phase 4 weeks later, the students deliver a list of requirements and a functional decomposition. During the conceptual phase, the students have to work out detailed concepts. After 6 weeks, 30 teams each deliver one or two concepts for review by their peers. The teams get one week to study all concepts and score them. At the end of the week all individual scores are combined to create a preliminary ranking. The students then have a group discussion to clarify some concepts and come to a final ranking. Based on this ranking, the professors together with the company select ten concepts for the students to develop. Most students felt involved and agreed that the group discussion led to a better ranking. During the last phase, the students make a detailed design in groups of 6 for 7 weeks. The end result is a technical report, including the calculations and design choices, and technical drawings. The students also give a presentation for the company. To be able to evaluate the students individually, they have to fill in two peer assessments. There is also an individual test at the end of the project to allow the coaches to identify spongers. The test consists of basic questions based on their own report. If they fail the test, they cannot earn a credit for the project.
Source: Lirias
Language: English
Subfield: Education
Field: Social Sciences
Domain: Social Sciences
SDG: Quality education
Open Access status: green
OpenAlex ID: W2525338790