Year: 1981
Type: report
Abstract: The Production Switching Heuristic (PSH) has been proposed as a practical procedure to solve the important aggregate planning problem.In this paper the PSH is examined in a non-stationary demand environment.Our analysis shows that the PSH may be too inflexible to handle dynamic demand situations and as a consequence may result in far from optimal solutions.This statement is documented bymeans of a number of case studies.
Source: Lirias
Authors: Marc Lambrecht, R Luyten, J Vander Eecken
Language: English
Field: Decision Sciences
Domain: Social Sciences
Open Access status: green
OpenAlex ID: W2525501007
