An Assessment of Project Management Maturity in Kazakhstan
Year: 2015
Type: preprint
Study design: Observational Study
Abstract: For more than sixty years organizations have been using methods and tools of Project Management (PM) which, in the past two decades, has become a diverse field of management application with its own knowledge domain. The success of such PM mapping into an organizational strategy and competency is measured by PM Maturity (PMM). The PMM models often aim at providing a framework for improving an organization’s business result by assessing the organization’s strengths and weaknesses in PM. The past ten years has shown an increase in PMM research and practice in various developed and developing countries. Given such a comparatively established background of global PMM studies and applications, this study aims at exploring its status in emerging economies. From this perspective this research focuses on Kazakhstan. With the purpose of investigating a current PMM status in Kazakhstan and filling a local maturity research gap, this work provides an empirical study on assessing PMM in the country. To achieve this aim, the paper first reviews some prominent maturity models and selects one for this study. Then, a questionnaire survey is conducted involving 22 local project managers from different industries in the country which represent a sample for the study. Third, after statistical analysis of the data, the research results are provided split into three streams on: revealing respondents’ profile, discussing demand for project managers, and determining a PMM level in the country. Overall, with the mean maturity level of 2.42 out of 5, the results show that PM tools and methods have not yet been used effectively in Kazakhstan. The results also suggest that PMM in Kazakhstani organizations is gradually moving from Level 2 to Level 3. This shows that the organizations ensure that each project is run with its own processes and procedures to a minimum specified management standard set in the organizations. However, it also implies that there is limited consistency or coordination between different projects. Finally, the study finds that, as PMM moves to Level 3, the organizations strive for having their own centrally controlled PM processes where all their individual projects would flex. All in all, the findings of the study add value to the existing PM body of knowledge in Kazakhstan and serve as a background asset to be used in facilitating the projectification of organizations in Kazakhstan.
Source: SSRN Electronic Journal
Author: Timur Narbaev
Institution: Kazakh-British Technical University
Language: English
Field: Decision Sciences
Domain: Social Sciences
Open Access status: green
OpenAlex ID: W2553429232