Modelling and optimisation of a micro-brewery production process
Year: 2015
Type: dissertation
Abstract: Production scheduling is a decision-making process that is applied in the manufacturing and\nservice industries to achieve efficiency, minimise production costs and maximise the profit. \nProduction process planning and scheduling are critical functions for the sustainable development \nof manufacturing processes that not only minimise the time or cost, but also improve adaptability, \nresponsiveness and robustness. Therefore, effective production process planning and scheduling is \nimperative in order to achieve sustainable manufacturing. This study presents a production \nscheduling problem and its optimal solution, for a typical real-life micro- brewery production \nprocess, based in Coventry, UK. In the brewery, various orders of product types arrive dynamically \nto form a queue for production in a variety of vessels with limited capacity. The operation of \nbrewery production is determined by the processing time, the setting up time, the changeover time \nof each product type and the cleaning time of each vessel. The due date for delivery the product to \ncustomers is another important factor. For the brewery production system, a multi-objective \noptimisation problem of minimising the overall production time in a job shop is considered in this \nresearch. A novel optimisation approach for the sustainable process and scheduling is presented.\n\nThe objective of the study is to formulate a mathematical model of a scheduling problem and to \ndevelop a Simulink model to simulate the scenario of the brewery production system. Subsequently, \nthe primary focus of this thesis is the design and application of meta-heuristics methods, namely, \ngenetic algorithm (GA), simulated annealing (SA) and ant colony optimisation (ACO), to optimise the \nbrewery production system. In addition, it proposes a hybrid method to solve the production \nproblem, which is comprised of an improved GA with the improved SA to minimise the total production \ntime. The advantage of the hybrid method is not only to achieve the combination of the global \nsearch capability of GA and the local search capability of SA, but also an effective avoidance of \nthe premature convergence and strengthen the global optimal solution at a higher temperature; at a \nlower temperature, the hill climbing of the SA can speed up the convergence. The proposed hybrid \nmethod is effectively applied to the brewery production system. The result demonstrates that the \nproposed method provides better performance and effectiveness when it is compared with other \nheuristic algorithms that include\ntraditional GA, SA, ACO, the improved GA and improved SA.
Author: Zhong Shen
Institution: Coventry University
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W2566488075