Problem space based search algorithm for manufacturing process with rework probabilities affecting product quality and tardiness
Year: 2009
Type: article
Abstract: In this paper, we propose a problem space based search(PSBS) algorithm to solve parallel machine scheduling problem considering rework probabilities. For each pair of a machine and a job type, rework probability of each job on a machine can be known through historical data acquisition. Neighborhoods are generated by perturbing four problem data vectors (processing times, due dates, setup times, and rework probabilities) and evaluated through the efficient dispatching heuristic (EDDR). The proposed algorithm is measured by maximum lateness and the number of reworked jobs. We show that the PSBS algorithm is considerably improved from the result obtained by EDDR.
Authors: Yong-Ha Kang, Young-Sup Lee, Hyun-Joon Shin
Institutions: North Carolina State University, Sangmyung University
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: bronze
OpenAlex ID: W2016922615
