Year: 2010
Type: conference-paper
Abstract: The resource-constrained project scheduling problem (RCPSP) is one of the best-known cumulative scheduling problems due to the interest from the operational research community, and to its many industrial applications. In this article we are concerned with the extension of the RCPSP that, beyond renewable resources considered in its basic version, also allows resources that can be produced and consumed during the execution of activities.This extension is called RCPSP with production and consumption of resources. For more detail about the state of the art, see for instance (Laborie 2003, Neumann et al. 2003, Bouly et al. 2005, Carlier et al. 2009).In our study, after a detailed description of the RCPSP and the considered extension, we present a mixed integer linear programming (MILP) model of the problem which uses variables indexed by events. Finally, we present some computational results
Institutions: Centre National de la Recherche Scientifique, Laboratoire d'Analyse et d'Architecture des Systèmes, École Nationale de l’Aviation Civile, Université Toulouse III - Paul Sabatier, Institut National des Sciences Appliquées de Toulouse, Université de Toulouse, Institut de Mathématiques de Toulouse
Language: English
Field: Decision Sciences
Domain: Social Sciences
Open Access status: green
OpenAlex ID: W2591677244
