Year: 1985
Type: article
Abstract: Planning in flexible manufacturing systems must take into account both the multiprocessing environment and the dynamically changing states.This paper uses a knowledge-based approacn to handle such a planning system, where three levels -i.e., the control, data, and pro- cedural levels -constitute its manufacturing knowledge.The construc- tion of plans for multiple manufacturing jobs requires four steps:(1) linear plan generation, (2) conflict detection, (3) plan synthesis, and (4) plan revision.To achieve goals, these steps will search for planning operators using a backward chaining inference procedure.To perform the scheduling and sequencing of the multiple jobs within a flexible manufacturing cell, the planning system modifies the nonlinear planning approach and adds resources and durations infor- mation to the action formalism.Because the plan-generation process is goal-directed, the dynamically adjustable plan can be constructed in real time.A prototype of this automatic planning system has been implemented in Franz LISP, an artificial intelligence programming language, and is applied to solve the real-time scheduling problem in flexible manufacturing cells.
Authors: Michael J. Shaw, Andrew B. Whinston
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W2593501398
