Work

Virtual building environments (VBE) - Applying information modeling tobuildings

Year: 2004
Type: article
Abstract: Virtual Building Environments (VBE) - Applying Information Modeling to Buildings V. Bazjanac Lawrence Berkeley National Laboratory, University of California, Berkeley, CA, U.S.A. ABSTRACT: A Virtual Building Environment (VBE) is a “place” where building industry project staffs can get help in creating Building Information Models (BIM) and in the use of virtual buildings. It consists of a group of industry software that is operated by industry experts who are also experts in the use of that soft- ware. The purpose of a VBE is to facilitate expert use of appropriate software applications in conjunction with each other to efficiently support multidisciplinary work. This paper defines BIM and virtual buildings, and describes VBE objectives, set-up and characteristics of operation. It informs about the VBE Initiative and the benefits from a couple of early VBE projects. INRODUCTION Most manufacturers thoroughly test their products before delivering them to the market. In some in- dustries the testing is done on physical prototypes, in other it is done virtually; in many industries it is done both ways. Manufacturers know exactly how their products are going to perform or hold up before these products are built and sold. For example, car manufacturers extensively test prototypes (both vir- tually and on the track) and know how the new models will perform before they start manufacturing them, even if they do not disclose all information in public. NASA thoroughly tested all new space ve- hicles in the Gemini, Apollo and Space Shuttle Pro- grams in simulation and launched them only after all problems were proven in simulation to have been solved; when unforeseen problems developed later (such as during the Apollo 13 mission), NASA was able to analyze and resolve problems in simulation. In most developed countries the buildings con- struction industry, sometimes called the Architec- ture-Engineering-Construction-Operations (AECO) or Architecture-Engineering-Construction-Facilities Management (AEC/FM) industry, is the second largest industry. Yet, virtually no testing of the pri- mary product of the industry – the building – is done before irrevocable and often very costly decisions are made. True, pre-manufactured components are often tested at least in some ways before delivery; mock-ups of critical parts of a building are built and tested at times; various types of the building’s per- formance are occasionally simulated; and extensive visual simulations (including “walk-throughs” and “fly-bys”) are becoming the norm. But no testing of the whole building in all of its aspects of perform- ance is performed before the building is delivered. Commissioning constitutes only a partial substitute for testing and is of little help if the building in ques- tion needs substantial redesign and/or reconstruction to perform as originally expected. The product conception-construction-delivery process in most other industries follows the “design- test/verify-manufacture-deliver-warranty” script. In contrast, the AECO industry seams to employ the “convince-build-pray” modus operandi. The de- signers convince the client by demonstrating a few selected performance aspects (usually cost and im- age) he/she can understand – but the designers can- not guarantee – that the building will work to the client’s expectations; the builders build the building, and then everyone awaits to see how the building will work once it is occupied and in use. They hope for the best, but fear the worst. At best, everybody is eventually relieved (even if some feelings have been hurt in the process); at worst, almost everybody involved faces legal consequences. Given that the “standard of practice” for how buildings are procured and delivered has not sub- stantially changed in more than a hundred years, no other modus operandi can really be expected. Most (building design) decisions are made without testing their effect first. Whatever testing takes place in the design and construction phases is limited to only a few aspects of performance (i.e. it is intended to aid only specific types of decisions); it is infrequent and usually lacks follow up. It is slow and often delays the building procurement and delivery process it is
Language: English
Open Access status: green
OpenAlex ID: W2596111870
FWCI: 2.629
Cites: 1
Cited by: 15
Related to: 10