Developing a framework to enhance building handover practices in public sector construction projects in the Kingdom of Saudi Arabia

Year: 2016
Type: dissertation
Abstract: Many public sector construction projects in the Kingdom of Saudi Arabia (KSA) are \nmarred by communication and coordination problems, with owners having to pay a high \nprice for schedule delays and cost overruns. The process by which building information \nis conveyed to owners lacks standardisation, a holistic approach, and consistency. This \noften results in KSA public sector owners receiving building information in a variety of \nformats, resulting in buildings operating at sub-optimal levels and relevant building data \nbeing unavailable at required times to support decision-making and optimal operations \nand maintenance. Existing systems of data management within KSA public sector \nprojects cannot match the demand of operations and maintenance, as buildings are \nbecoming more complex, in terms of space management, energy demand management, \nand addressing environmental concerns, due to the functional requirements of modern \ninfrastructure. This research focuses on investigating key technology and processrelated \nchallenges in order to ensure smoother transition of information from project \ndesign and construction to maintenance and operation phases of a building’s lifecycle. \nThis research aims to develop a framework to enhance data management in building \nhandover practices of public sector construction projects in the KSA. This framework \nhelps improve the operation and maintenance of buildings by establishing a relationship \nbetween the project design and construction team, and the operations and project \nmaintenance team. The research identifies key data requirements for effective building \nhandover from a Saudi client perspective. \nIn order to achieve the research aim, an empirically based systems analysis of a singledetailed case study organization of Al Madinah Al Munawwarah, Regional \nMunicipality in KSA was carried out. Substantial fieldwork was undertaken using both \nqualitative and quantitative methods to match specific research questions. The \nquestionnaire survey provides a wider view of building handover practices in the KSA, \nwhile the qualitative study provided an in-depth understanding of the state-of-the-art in \npractice. Many tools were used to collect the data, including semi-structured interviews \nsupplemented by survey questionnaires together with documentation review. The \nimplementation of more than one method to collect the data was used in order to achieve data triangulation, to explore implementation of data management in building \nhandover practices, and to provide a more an in-depth understanding. \nThe finding of this research concludes some unique factors that affect the \nimplementation of actual building handover practices within the public sector \nconstruction industry in KSA. These factors include: high manager turnover; lack of \nknowledge and experience; lack of use of technology; lack of training; lack of \ncommunication during project data at the Handover Stage; unclear responsibilities. \nHowever, the finding indicates that it is important for all managers in public sector \nconstruction to understand that the handover is started already at the beginning of the \nproject. Furthermore, early handovers must be reviewed and strengthened during the \nfinal project handover. \nAlso, the research findings confirmed that the lack of communication was possibly \nbecause of the fact that the project team is big and multi-cultural. Thus, the individuals \nwere afraid to ask any questions as they assumed others would think that they were too \ninexperienced to understand some technical specifications. Hence, it is highly critical to \ndefine and use a clear communication procedure. Every manager is responsible for \ncommunicating internally and externally about status and issues. These findings will \nstrengthen the existing literature on effective data handover at project completion stage \nand will narrow the gap in knowledge in KSA studies in particular and to Arab studies \nin general. Therefore, significant recommendations to the policy, practitioners, and \nresearchers, within both the public and private sector projects, are made to aid and \nimprove construction industry practices. \nThis research provides specific original findings, which include an in depth \nunderstanding of factors that affect the facilitation of data management in building \nhandover practices of construction projects in the KSA via a case study conducted \nwithin the KSA public sector construction context. This research is the first study in \nKSA regarding issues that affect data management in building handover practices of \nconstruction projects in the KSA. It is also the first academic study of the Al Madinah \nAl Munawwarah, Regional Municipality in KSA.
Author: Sam Hijazi
Language: English
Open Access status: green
OpenAlex ID: W2607268001
Cites: 48
Cited by: 3
Related to: 10