An analysis of operational experience during low power and shutdown and a plan for addressing human reliability assessment issues
Year: 1994
Type: report
Abstract: results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. The authors recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few procedures are available for mitigating accidents that may occur during shutdown. Procedures written specifically for shutdown accidents would be useful.
DOI: 10.2172/10171709
Language: English
Topic: Risk and Safety Analysis
Subfield: Statistics, Probability and Uncertainty
Field: Decision Sciences
Domain: Social Sciences
Open Access status: green
OpenAlex ID: W261298835
