Implementation of an economic model at Gold Fields Limited
Year: 2006
Type: article
Abstract: Cyest Corporation was contracted by Gold Fields Limited in 2003 to assist in the development of a prototype economic optimization model (EOM) using Microsoft Exceli?½. The rationale for the exercise was to develop a strategic planning tool to improve decision making. The success of this initiative resulted in Gold Fields commissioning a prototype i?½Mini EOMi?½ for all the South African operations to test economic viability and optimize the NPV of the life of mine reserve plans and projects. The i?½Mini EOMi?½ is a leaner version of the i?½big brotheri?½ EOM and uses the same costing and financial methodologies to generate the shaft and mine financial metrics from hard coded shaft production schedules. The i?½Mini EOMi?½ has allowed the quick generation of economics for a life of mine schedule allowing more time to optimize and test different production scenarios. Gold Fields have now commissioned Cyest Corporation to develop this into a robust enterprise wide economic model. This paper discusses briefly the rationale behind the i?½Mini EOMi?½ philosophy, how it has been implemented at Gold Fields and the way forward to achieving a robust enterprise-wide solution that integrates into all existing transactional and planning systems.
Authors: Erin Lane, Hudson, J.H.K. Bondi
Institution: Gold Fields (South Africa)
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: diamond
OpenAlex ID: W2613408339
