Year: 2014
Type: article
Abstract: In water resources planning, to decide proper water supply capacity is a very important task. Once water supply system such as a dam is decided, it will affect whole range of water resources circumstances for a long time. Even though systematic approaches have been implemented since 1980, many problems are still prevail in reality. Especially some issues related to the reliability analysis method used in planning dams in Korea have been persistently brought up. This study is to diagnose problems on the reliability criterion in water supply capacity assessment of water resources systems and discuss a valid method. As a result, the estimates by the different analysis time intervals, in case of the temporal reliability, show no large difference, but there is a large difference when assessment time intervals are differently applied. The volumetric reliability accounts for 2~3% higher than that of the temporal reliability, and resiliency and vulnerability also show large differences by the analysis time intervals.
Authors: Gwang-Man Lee, Jaeeung Yi
Institution: Ajou University
Language: English
Subfield: Water Science and Technology
Field: Environmental Science
Domain: Physical Sciences
Open Access status: bronze
OpenAlex ID: W1976556480
