Estimation of distribution algorithm with path relinking for the blocking flow-shop scheduling problem
Work
Year: 2017
Type: article
Abstract: This article presents an effective estimation of distribution algorithm, named P-EDA, to solve the blocking flow-shop scheduling problem (BFSP) with the makespan criterion. In the P-EDA, a Nawaz–Ensco... more