Mathematical models of missile launching, part i

Year: 1964
Type: article
Abstract: By means of a mathematical model of the situation, including assumptions about the nature of the delays encountered, an estimate is presented of the expected number of days required to launch three missiles, each from its own pad, allowing no simultaneous (i.e., sameday) countdowns or launches.