Advancements in the Base-Band-Tune and Chromaticity Instrumentation and Diagnostics Systems during LHC's First Year of Operation
Year: 2011
Type: article
Abstract: The Base-Band-Tune (BBQ) system is an integral part of day-to-day LHC operation, driving tune and chromaticity diagnostics and feedbacks. This contribution summarises the system’s overall performance and documents the various improvements of the analogue front-end circuitry, digital post-processing and integration, necessary in response to issues arising during high-intensity physics operation since its first introduction in 2005.
Authors: M. Gąsior, Stephen Jackson, Ralph Steinhagen
Language: English
Subfield: Nuclear and High Energy Physics
Field: Physics and Astronomy
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W277431989
