Year: 2017
Type: conference-paper
Abstract: In the context of high-quality products, some manufacturing companies suffer from a high reworks rate and, consequently, they have also problems with their production flow scheduling. This preliminary work deals with one of such companies. The aim, is to propose a solution based on a global schedule which will interact with the smart products or lots and with collaborative local schedules having their own specifics goals. In order to strengthen the reactivity faced to internal variations (reworks loops) or external variations (demands changes) and to ensure that the global schedule of the whole system will be realistic, the concept of smart products has been adopted.
Source: HAL
Institution: CRAN
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W2803786138
