Work

Råd för installation av värmedetektionskablar

Year: 2006
Type: report
Abstract: General advice on where to place linear heat detectors on facades and under eave are given based on experiments and computer simulations of a fire plume close to a facade.The fire is assumed to be arson in a garbage bin producing 100-150 kW.Temperature readings were made on several places along the façade in the experiments.In addition a few linear heat detector wires were mounted in some of the tests.The linear heat detector wires were of different types, maximum temperature detection and differential heat detection respectively.CFD simulations were made using the computer codes Sofie and FDS.The experiments and simulations show that:• It is best to place the wire as low as practically possible, but not as low as 1 meter.• One should not mount maximum heat detection wires under the eave on two story buildings.• It is better to mount the wire a bit away from the wall/eave in order to avoid cooling from this.• It is better to mount the cable rather close to the wall when mounting underneath the eave.• Time to activation is considerably longer if the wire is mounted in a pipe.• A component test needs to be developed that determines the heat response of the cable and possible sabotage protection.This can then be used together with the results of this report to determine when a cable will be activated.
Language: Swedish
Open Access status: green
OpenAlex ID: W2842901211
Cites:
Cited by: 6
Related to: 10