Installation of new equipment : Movable irradiation tables operational
Year: 2013
Type: article
Abstract: CERN is constructing a new irradiation facility in the PS (Proton Synchrotron) EAST AREA.The facility will contain a proton and a mixed irradiation field facility and is planned to be operational in 2015.Part of the infrastructure of the proton irradiation facility is produced in the framework of the AIDA project.This document reports about a series of irradiation tables that will serve to place different objects under test into the proton beam for irradiation experiments.
Authors: M. Gläser, Federico Ravotti, M. Moll
Language: English
Subfield: Nuclear and High Energy Physics
Field: Physics and Astronomy
Domain: Physical Sciences
Keywords: proton beam, AIDA project, equipment installation
Open Access status: green
OpenAlex ID: W2904732076
