Abstract: This research discusses about optimalization process production at assembling line Helmet Company. Order from customers increases and resulted the production at the maximum level. At this level order still increases, then the existing production process will be not normal. From the shows the production process is still not running in the good condition and  makes the imbalance of the assembly lines. To solve it then do the line balancing process. Line balancing process performed with the Helgeson-Birnie, Moodie Young, and New Bidirectiona method. The Result from this research showed that the Moodie Young method is better to design the line balance, with a level of line efficiency 85,78%, Balance delay 14,22%, Smoothing Index 6, 32 with 10 numbers of work station and increases production capacity 40,62 %.
Language: Indonesian
Open Access status: diamond
OpenAlex ID: W2948729596
FWCI:
Cites:
Cited by:
Related to: 10